Showing posts with label 2-8-0. Show all posts
Showing posts with label 2-8-0. Show all posts

Sunday, February 9, 2014

Today's Train of Thought- Olympic Consolidateds, Feb 9th, 2014


In honor of the opening weekend of the 2014 Winter Olympics in Sochi, Today's Train of Thought harkens back to the 2002 Winter games on Salt Lake City- the last Olympiad to take place in the USA.

Part of the ceremonies leading up to the 2002, the Olympic torch moved by rail more than once but it's final and most noteworthy leg was on the 16-mile Heber Valley Scenic Railroad in Utah where the tourist railway went past Soldier Hollow in Wasatch Mountain State Park- home of the cross country skiing and biathlon venues. The torch train featured three steam locomotives operating as a tripleheader- an impressive feat considering that at the time, the Heber Valley was home to two working steam locomotives at the time. A few weeks prior to the game, Nevada Northern 2-8-0 Consolidation was trucked in from Ely, NV to help with the Heber Valley's increase in traffic- allowing the ALCo to operate with Heber Valley's in-house Baldwin 2-8-0 Consolidations- former Union Pacific #618 and Great Western #75. Each of the Heber Valley's Consolidations were lettered for their former owners as well.

Here, railpictures.net contributor Greg Brubaker caught the rare tripleheader steaming across a trestle over the Provo River with the torch train enroute to the Soldier Hollow venue on Feb 7th, 2002. Within a few weeks of the closing ceremonies, the Nevada Northern #93 was trucked back to Nevada. While the Heber Valley still has the #75 and UP #618, both are idle awaiting their FRA mandated 15 year boiler inspection.

Saturday, November 5, 2011

Iron Horse Roundup For October 2011


Providence & Worcester B40-8W #4005 traverses the P&W Willamantic branch in Lisbon, CT pulling a joint office car special with officials from Canadian Pacific, Vermont Railway, New England Central and the P&W on October 19, 2011. Photo, Tom Nanos.
NEW ENGLAND: Some of you might recall back in late August that officials from Guilford/Pan-Am and Norfolk Southern [NYSE: NSC] observed progress on the Patriot Corridor project and using a joint office car special, inspected intermodal facilities in Ayer, MA and one under construction in Mechanicsville, NY before Hurricane Irene struck.

A second, separate office car special for officials from the Canadian Pacific [NYSE: CP], the Vermont Railway, Rail America's [NYSE: RA] New England Central and the Providence & Worcester [NASDAQ: PWX] was supposed to take place on the Green Mountain Gateway in late August as well, but was postponed indefinitely because of extensive flood damage both the Vermont Railway and New England Central sustained due to Tropical Storm Irene.

Powered by a General Electric locomotive from Providence & Worcester and with two passenger cars from the Vermont Railway in tow, the OCS got underway departing east out of Whitehall, NY and continuing on towards Bellows Falls, VT on October 19th over the recently-reopened Green Mountain Railway line which was pummeled in the wake of Tropical Storm Irene. From there, it continued south over the New England Central to Willamantic, CT via Palmer, MA. At Willamantic, the train continued east over Providence & Worcester's Willamantic Branch to Plainfield, CT.

Reopened in 2007, the Willamantic branch was plagued by a series of derailments in 2010 and the FRA ruled that the line would be downgraded to 'excepted', limiting speeds on the line to 10 MPH and preventing more than 5 cars of hazardous materiel from travelling the line. At Plainfield, CT, the Willamantic Branch intersects with the P&Ws Worcester, MA to Groton, CT line and from these, the OCS headed back north into Massachusetts. Since the derailments, many of the unit ethanol trains that traverse the Green Mountain Corridor simply travel all the way south to the NECR/P&W interchange at New London, CT before continuing on to Providence via Worcester, MA.

Besides unit ethanol trains, the railroads that make up the Green Mountain Gateway hope to compete against Norfolk Southern/Pan-Am's 'Patriot Corridor' and CSX's Boston line for autorack and intermodal traffic. In 2006, the Green Mountain Gateway saw unit trains of imported coal from South Africa being offloaded in Providence, RI with a final destination of Johnson City, NY- just west of Binghamton, NY- via Canadian Pacific's former Delaware & Hudson Bridge Line for a few weeks as the power plant there was test burning various grades of coal. While there is no more unit trains of imported coal for Johnson City, the P&W does still handle unit trains of imported coal to First Light's Mt. Tom, MA power plant and Northeast Utilities [NYSE: NU] Bow, NH plant.


LIRR commuter trains meet at Huntington Station- Photo, Jospeh Meade
NEW YORK
: Hundreds of Long Island Railroad Employees may have scammed New York City's MTA and the US Railroad Retirement Board out of more than $1 billion in a pension and disability fraud scheme dating back to at least the late 1990s. Eleven people, including two doctors and the former President of United Transportation Union Local 645, have been charged with the decade-long scam bilking the pension of the nation's largest commuter railroad.



Janice Fedarcyk, the head of New York’s FBI office, called it a “game where every retiree was a winner.” U.S. Attorney Preet Bharara said the disability pension program was not designed to be “a feeding trough for the truly dishonest,” but authorities say that’s what happened.

Hundreds of LIRR employees falsely declared themselves disabled to collect more pension money from the ages of 50 to 65, when they would otherwise qualify for full benefits, according to a criminal complaint filed in U.S. District Court in Manhattan.

The complaint said a retired engineering manager who complained of severe hand, knee, shoulder and back pain often played tennis and golf while collecting about $105,000 yearly in combined pension and disability payments.

Another former employee said she suffered neck, shoulder and hand pain from computer work and couldn’t stand more than five minutes without leg pain. She was “surveilled shoveling heavy snow for approximately one and a half hours,” the complaint said. She gets about $108,000 a year in combined pension and disability payments.

The complaint said many workers who retired with disability benefits worked unusually high amounts of overtime in the five years before retirement because pensions are calculated based on earnings during that period. The heavy workloads often continued “right up until the very day when they and their physicians claimed they were utterly unable to continue doing their railroad jobs,” the complaint said.

The complaint also seemed to place some of the blame for the scandal on the pension system itself, saying the “exceptionally high rate of occupational disability applications for the LIRR can be attributed to the fact that the LIRR, and the LIRR alone, offers a pension to employees as young as 50 years old.” The complaint said unscrupulous employees lie about their physical condition so they can retire at an earlier age with a salary almost equal to what they got when they were working.

Three doctors, one of whom has since died, were responsible for 86 percent of the railroad’s disability applications before 2008. One doctor recommended at least 839 LIRR employees for disability from 1998 to 2008, the complaint said.

Authorities said the doctors collected $800 to $1,200 in fees from each patient as they built disability cases by prescribing unnecessary medical tests and physical therapy. They said the doctors then fabricated or grossly exaggerated medical assessments and built illness narratives to show the employees were unable to work.
The charges stem from a September 2008 investigative report in the New York Times which pointed out that nearly 90% disability attriton rate of the LIRR personnel. The claims were not just limited to engineers, conductors or track workers, either- the former deputy general counsel and claims manager were seeking disability according to the New York Times report.

The MTA claimed that it had no say-so in awarding the fraudulent disability payments and that the RRB was acting as a rubber stamp for any claim that came before it. The FBI and RRB's Inspector General have filed charges against the 11 participants in the scheme where they feel they have the strongest evidence. Since its creation in the 1930s, the RRB is the government agency that administers disability, unemployment, retirement and survivor benefits to railroad workers and their families.


Southbound Alaska Railroad freight train at Hurricane Gulch, AK- Photo, Ted Smith-Peterson
ALASKA: The Alaska Railroad broke ground on their 80 mile Delta Jct Extension at the end September by beginning construction of a bridge spanning the Tanana River in Salcha, AK.

The first phase of the project includes the construction of a 3300 ft bridge and 11,000 foot levy. The construction is expected to cause intermittent delays and congestion for the next two years (no work will be done in the dead of winter) but project managers are hoping some 75 truckloads of firewood donated to area residents will offset any inconvenience. The new extension will give the Alaska Railroad access to the US Army's Fort Wainwright as well as potential shippers in the agricultural, mining and petrochemical sectors.



New England Central Rock Train passing Winooski Gorge with Toldeo Peoria & Western GP40-2LW #4053 in the lead at Winooski, VT on November 1, 2011. Photo, Matt Powell
VERMONT: While the railroads throughout the Green Mountain state have reopened in the wake of Tropical Storm Irene, the same can't be said for the state's road network. Hit particularly hard was Vermont Route 107 to the west of Bethel. Surging floodwaters from the nearby White River have obliterated sections of the road.

The state of Vermont is hoping to have the highway up and running by mid-December, and to that end they're enlisting the aid of the Vermont Railway and New England Central to do some of the heavy lifting.


The rocks are loaded onto the side-dump gondola cars on the Vermont Railway outside of Burlington and then handed off to the New England Central, where they turn south at Essex Jct and continue about another 50 miles over the newly reopened former Central Vermont mainline to Bethel, where they're dumped down an embankment for trucks to haul the rest of the way to the construction site.


Knoxville Locomotive Works Photo
TENNESSEE: Gulf and Ohio has officially entered the low-emissions diesel market with the unveiling of their KLW20B prototype in October. The Knoxville Locomotive Works website claims a fuel savings of up to 30%, lower rate of oil consumption and compatibility with already-existing components from EMD (the locomotive was made from the frame and carbody of a Norfolk Southern GP38).

Reportedly, the locomotive underwent testing on Gulf and Ohio's Knoxville and Holston River, which is also home to the G&O's 1890 built 2-8-0, Southern #154 that had been fully restored in 2010.

TVRM's Southern 2-8-0 Consolidated #630 leading an excursion on Norfolk Southern's Atlanta North District at Chattanooga, TN over the Labor Day weekend. Doyle Massey photo
ELSEWHERE IN TENNESSEE: Norfolk Southern's 21st Century steam program began in earnest over the Labor Day weekend with Tennessee Valley Railroad Musuem's Southern 2-8-0 #630 powering mainline excursions over the Norfolk Southern's North Atlanta District

The Labor Day excursions over the Norfolk Southern also coincided with the TVRM's 50th anniversary, which featured a number of static displays and some diesel excursions [as well as the largest Moon Pie; no foolin'- NANESB!]. Although Tropical Storm Lee put a damper on some of the celebrations, the TVRM's Labor Day railfest was well attended and the #630 is expected to power another mainline excursion over the Norfolk Southern- this time to Knoxville, TN on November 14th.

Thursday, March 31, 2011

Iron Horse Roundup For March 2011- China's High Speed Graft Problem; BNSF Crew Killed in Shuttle Wreck; Southern Consolidated Returns to Steam


Railpictures.net photo- Yu Ming
CHINA: A series of internal government audits have found that China's much-vaunted high speed rail projects have been plagued by corruption, embezzlement, misappropriations and cost overruns, China's National Audit Office announced on Wednesday.
China’s state audit office said on Wednesday it had identified numerous cases of embezzlement and other irregularities from just a three-month period of construction on the Beijing-Shanghai high-speed line last year and has passed the cases on to judicial authorities for formal investigation.

China’s railway minister and the rail ministry’s deputy chief engineer were both removed from their positions last month for “severe disciplinary violations” — an allegation that usually results in criminal charges for corruption.

The former minister, Liu Zhijun, is the most senior government official to be implicated in corruption in the past five years and his downfall has raised doubts about the future of the hugely ambitious high-speed rail expansion plans he championed. Neither Mr Liu nor Zhang Shuguang, the former deputy chief engineer at the rail ministry, have been named in connection with the state auditor’s investigation into the 1,318km, $33 billion Beijing-Shanghai high-speed rail project, which is scheduled to open to the public next year.

The line is the longest and most expensive high-speed rail project in the country but it has been dogged by scandals and controversies and singled out in previous state audits for financial “irregularities”. In its latest report the auditor also cited numerous cases of flawed procurement procedures, overcharging, unexplained costs and fake receipts related to the project.

An intense safety review of all projects is under way because of fears that corruption and the speed with which the network has been built will result in poor quality tracks that are meant to carry trains travelling at up to 380 km/h

Chinese High Speed Rail Attendants- Xinhua Photo
According to the state-run Xinhua News Agency, auditors say that embezzlers made off with the equivalent of $28.5 million for just the Beijing-Shanghai high speed rail project.

As a matter of personal opinion, I think this stands out as a cautionary tale over pinning any sort of long term economic recovery on numerous massive public works projects that would make the Big Dig look well run and fiscally responsible in comparison. It doesn't help that some of the politicians who are the most enthusiastic backers of high-speed rail here in the USA also backed things like TARP, the Stimulus or various government bailouts and have demonstrated zero appreciation for the massive costs involved in building and maintaining a dedicated high speed line.
Photo- Bill Wagner/Longview Daily News
WASHINGTON: Two BNSF Employees and a shuttle driver were killed while a fourth BNSF worker was in critical condition after a BNSF grain train collided with the shuttle van carrying them on March 24th in Longview, WA.

58 year old engineer Tom Kenny, 28 year old conductor trainee Christopher Loehr- both based out of Seattle- and 52 year old Dwight Hauk of Auburn, WA were being picked up by 60 year old shuttle driver Steven Sebastian and take to Vancouver, WA after their shifts when they were struck by the train.

The crossing is a remote, private crossing with no lights or arms that lower and raise on a train's approach. Instead, the crossing features a warning signs on top of a stop sign.


Railpictures.net- John Higginson
TENNESSEE: For the first time in 21 years, Southern Railway 2-8-0 consolidated #630 is under steam. The Tennessee Valley Railroad Museum spent the better part of a decade restoring the 1904-built ALCo to working order, with break-in runs taking place over the last weekend of March 2011.

Almost as noteworthy as the fact that the 2-8-0 is up and running once again is the fact that news of #630's revival was announced on Norfolk Southern's official Twitter page and a short video of the #630 being fired up on the company's official YouTube account. Norfolk Southern had announced last year that it would begin a partial revival of its steam program, using historic equipment form the Tennessee Valley Railroad Museum.

Ermelo in happier, more derailment-free times- Eugene Armer photo
SOUTH AFRICA: A derailment on the Transnet line between Ermelo and Richards Bay in the northeastern corner of South Africa is expected to slow coal exports.
The accident, which occurred on Wednesday near Ermelo in South Africa's northeastern Mpumalanga province, is likely to add pressure on South African coal producers, already struggling to export all their coal due to bottlenecks on the rail lines.

Spokesman Sandile Simelane said one of the two lines would reopen on Friday but could not confirm when the other would reopen.

"We anticipate one of the lines to reopen tomorrow," he told Reuters, adding that an investigation into the cause of the derailment was ongoing.

He declined to comment on how much tonnage would be lost as a result of the derailment. Besides the immediate impact, it also means trains have to be rerouted, causing further disruption to the transport of coal.

South Africa is a major exporter of coal to power stations in Europe and Asia, but exporters have failed to ship all of their product because of bottlenecks on the lines approaching the huge Richards Bay Coal Terminal.

South Africa exported 63.43 million tonnes of coal last year, boosted by demand from China and India, but far below the terminal's expanded capacity of 91 million tonnes.

Industry representatives have said South Africa was unlikely to export 60 million tonnes this year due to frequent problems on the line.

Transnet is investing heavily in new and improved infrastructure, but it will take years before a substantial increase in transported tonnages is seen.

Monday, January 31, 2011

Iron Horse Update- Kiwis Go for Chinese; Deadly Wreck in Germany; Maine Buys 230-Mile Line; Steam In, Steam Out; New Shortlines on the Canadian Prarie

NEW ZEALAND: The first batch of 6 locomotives from Kiwi Rail's 20 unit order from China's Dalian Locomotive and Rolling Stock arrived in New Zealand at the end of November.

The locomotives are designated by Kiwi Rail as 'DL' class and rated at 3600 HP each and feature cabs at each end. Since arrival, the DLs will undergo commissioning and crew familiarization at Kiwirail's Hillside shop. The DL's will likely augment or replace older GE diesels, some of which were rebuilt when KiwiRail was part of Australia's Toll Holdings [ASX: TOL]. New Zealand's Rail and Maritime Transport Union has expressed concerns that the Dailan locomotives were too heavy for use on Kiwi Rail and that there are visibility problems with the cabs on each end.

The arrival of the locomotives came a few weeks before Kiwirail announced that China's CNR had beaten out Kiwirail's own Hillside shops for a contract to build 300 new COFC flatcars. Reportedly, the Rail and Maritime Transport Union is considering action along the lines of refusing to unload the remaining incoming DLs from ships in New Zealand to protest the contract being awarded to CNR.
GERMANY: At least 10 people were killed and and 50 injured with the death toll expected to rise after a passenger train collided with a freight train in the eastern German state of Saxony-Anhalt.

Investigators believe the freight train was travelling at speeds of 50 MPH while the passenger train was moving at 70 MPH. The passenger train- HarzElbeExpress (HEX)- was travelling between Magdeburg to Halberstadt when it collided with the freight train carrying lime.

State prosecutors have begun a criminal probe to determine if human error played a role in the accident or if a defect sent the two trains on the same track.

CANADA- NEW BRUNSWICK: The New Brunswick Southern Railway is continuing to rebuild after heavy winter rains hammered the Maritime provinces in mid-December. A 40 mile section of track between McAdam and Milltown, NB on the NBSR 's St. Stephen subdivision was hit with 32 separate washouts, 10 of which had been repaired by the first week of the New Year. [Hat tip- Confessions of a Train Geek]

Photo- Cal Murray
CANADA- SASKATCHEWAN: Less than a year after the startup of the Last Mountain Railway between Regina and Davidson, SK an even newer railway has acquired the 82-mile former Canadian Pacific line between Richardson and Stoughton southeast of Regina.

Motive power for the line is a pair of B23-7s from the nearby Last Mountain Railway (nee Southern) which started up operations in late 2009. The Last Mountain will be replacing the recently departed pair of GE's with a trio of former Canadian National/Wisconsin Central SD40-2s.


John Lucas- Edmonton Journal
CANADA- ALBERTA: Grain farmers in the Battle River region of Alberta are bucking a trend of abandoned branchlines and concrete mega-elevators, purchasing an 80km, C$5,000,000 former Canadian National branchline in order to preserve a railway link with the rest of Canada.
The railway has been a fixture of communities such as Forestburg, 180 kilometres southeast of Edmonton, for almost a century. So it was a shock when CN first announced it planned to abandon the route in 2003 at the end of a drought-stricken growing season after grain output — and grain car traffic — fell sharply.

“CN just came and said that was it, they intended to close the line, and we could truck our grain to the central terminals,” said Ken Eshpeter, a farmer in Daysland and chairman of the fledgling Battle River Railway.

So in late 2003, about 180 farmers quickly organized a “producer car group,” which could bypass the terminals and order its own rail cars directly from CN. They began loading directly from trucks or storage bins into grain cars spotted at sidings in hamlets along the route.

Galahad farmer Howard Vincett was among the first.

“We started a buddy system with our experienced farmers helping others who were new to it. Soon we had a lot of farmers doing it,” he said.

“People were meeting and helping their neighbours. It was wonderful to see such a return of that community spirit.”

As local elevators disappeared across the West, farmers had accepted the situation. They bought bigger trucks and drove 50 kilometres or more to the large concrete terminals along the main rail lines, where they could wait for hours in line.

But by using augers at rail sidings, the self-loaders were proving there was an alternative.

So when CN decided in late 2008 that the Battle River line was to be sold for the price of salvage, the co-operative began raising money for a bid.

“We couldn’t allow this wonderful infrastructure to disappear,” said Reg Enright, the railway vice-chairman who operates a farm near Rosalind.

Because of the success with self-loading, a lot of farmers felt the same way, and bought hundreds of the $5,000 “B” shares that allowed them to move five grain cars in the future for the price of the share.

“We told them straight up that this was a risky venture. But if it all failed, we could still sell the rails, and it is the best-quality, 132-pound, main-line steel,” Eshpeter said.

At today’s higher salvage prices, the 80 km of rail would likely be worth more than the $5 million paid to CN.
Battle River Railway Co-op's motive power is a sole former Canadian National SD40-2W, although a 2 stall heated enginehouse is under construction.

Photo- Kevin Burkholder
MAINE: The State of Maine has finalized the purchase of more than 230 miles of former Montreal Maine & Atlantic (nee Bangor and Aroostook) trackage between Madawaska and Millinocket, ME in November. The MM&A and the state had agreed on the purchase price of $20.1 million and the FRA cleared all legal hurdles for the state of Maine to assume ownership of the lines this month.

Because of mounting financial losses, the MM&A filed to abandon the line between Madawaska and Millinocket as well as branchlines between Squa Pan and Easton, ME and Oakfield and Houlton, ME in Feb. 2010. Rather than permanently cut off rail service to customers in Northern Maine, the state opted to raise funds to purchase the lines and lease them back to the MM&A, although they could subcontract operations to a third party such as Pan Am Railways or the New Brunswick Southern.

STEAM: With 2010 coming to a close, that also meant that it was time to drop the fires on some restored steam locomotives for the 15 year FRA boiler inspection.

Photo- Matt Beisser
CONNECTICUT- Valley Railroad's 1926-built former Birmingham & Southeastern ALCo 2-8-0 #97 made its last run before it was slated for the 15 year FRA inspection in late December. The #97 has been with the Valley Railroad from the beginning, when it started up in the late 1960s on a derelict former New York, New Haven & Hartford branch that ran parallel to the western bank of the Connecticut River.

Although the #97 will be out of service for the foreseeable future, this will not leave the Valley Railroad without steam power. Besides former Aberdeen & Rockfish 2-8-2 #40, the Valley RR also purchased fire-damaged Chinese built 2-8-2 SY #3025 from Pennsylvania's Knox & Kane Railroad in 2008.

Photo- Richard Stevens
WISCONSIN- The clock was winding down on Soo Line ALCo 2-8-2 #1003 in November 2010 as well, as her it was getting near time for her FRA mandated boiler inspection. The 1913-built Mikado ran a series of excursions and photo freights on the Wisconsin & Southern lines in the southern part of the Badger state for the last decade or so.

One of the final runs (before the FRA inspection) of the 1003 featured Polar Express author Chris Van Allsburg working as the 1003's fireman back in late October. The #1003 was also able to serve as power for the WSOR's 'Santa Train' in November.

When not in operation, the venerable Mikado is usually kept at the Wisconsin Automotive Museum in Hartford, WI.

Photo- Jim Kleeman
PENNSYLVANIA- Like Soo Line #1003 and Valley Railroad #97, the time has come for the mandated boiler inspection for Steamtown's Canadian Pacific 4-6-2 'Pacific' #2317. For the last two years she had been relegated to the 'Scranton Limited' trains that operated entirely within the Steamtown complex due to an issue with the trailing truck.

There is some ambiguity as to exactly when the #2317 might steam again. Some have said that Steamtown has put a higher priority on bringing Baldwin Locomotive Works former Eddystone, PA plant 0-6-0 switcher #26 back to service, followed closely by Boston & Maine 1934-built Lima 4-6-2 #3713.
Photo- Cory Rychener
STEAM 2.0- WHAT'S NEW IN 2010 AND BEYOND: Although the fires have been dropped on some big steam in 2010, others locomotives have returned to service after being dormant for decades.

KANSAS- Perhaps the most under-the-radar development as far as steam was concerned turned out to be the successful restoration of Santa Fe Baldwin 4-6-2 #3415 by the Abilene & Smoky Valley Railway in Abilene, KS. The 1919-built Baldwin was taken out of service by the Santa Fe in the late 1950s and donated to the City of Abilene where it was on static display for the last 40 years in Eisenhower Park before the city donated it to the all volunteer A&SV in the late 1990s.

After more than 12,000 volunteer hours, the 3415 was successfully test-fired in 2008 and cosmetically restored to her original appearance by late 2009. The 3415 will operate a few times a month on the A&SV's former Rock Island branchline between Abilene and Enterprise, KS when the railroad isn't using their 1945-built ALCo S1 diesel switcher [she's shown above arriving at Enterprise, KS on Independence Day weekend 2010 before having to run around her train and return to Abilene running tender-first].


Photo- JL Scott
Perhaps the oldest steam locomotive to be restored to working order is Southern 2-8-0 #154. The locomotive was built by the Schenectady Locomotive Works (a precursor to ALCo) in 1890 for the East Tennessee, Virginia & Georgia. Four years later, the ETV&G and the Richmond & Danville merged to form the Southern Railway, where the #154 continued to serve he Southern in Eastern Tennessee before being retired and donated to the city of Knoxville, TN where it was put on static display in Chilhowee Park. In 1989, it was given to the Old Smoky Railroad museum before being donated to the Gulf & Ohio Railways in 2008. Gulf & Ohio operates the popular Three Rivers Rambler seasonal excursions in Knoxville with 1925 built former Washington & Lincolnton 2-8-0 already powering some of the excursions.

Thanks to the hard work of the folks at Gulf & Ohio, Southern 154 was back in service and powering trains on the 3 Rivers Rambler in time for her 120th Birthday in July of 2010. The 154 is both the oldest operable Southern locomotive and the oldest known operating ALCo locomotive.

Photo- Jake B
ILLINOIS- A somewhat newer Southern locomotive also returned to service in the Midwest when the Monticello Railway Museum in Illinois completed their restoration of Southern Railway 2-8-0 Consolidation #401 in September 2010.

Along with some of the 1950s vintage streamlined diesels, the 1907 built Baldwin operated a number of excursions of the museum's 15 miles of right-of-way in September 2010. In 1995, a donor for the museum suggested that a working steam locomotive should once again be part of the Monticello Railway Museum, and after doing an inventory, it was decided that the Southern 401 was the most feasible candidate for restoration.


Photo- Ken J Johnson
CALIFORNIA- The Fillmore & Western railway occupies a fairly unique niche. While operating excusrions on a former Southern Pacific branch line between Montalvo and Piru, CA, it also features prominently in films like Inception or Seabiscut. Given its proximity to the Hollywood studios, the lightly used branchline is also just about ideal for movie and TV shoots for any scene involving trains.

To go with their stable of EMD and ALCo diesels is recently restored former Duluth & Northeastern Baldwin 2-8-0 #14, which reportedly will be fired by vegetable oil. Restoration work on the 1913 Baldwin was completed in November 2010, in time for the Fillmore & Western's Christmas excusrions. On January 2nd, the Fillmore & Western had a special excursion pulled by #14 for the volunteers who spent so much time getting her back to working order.

Thursday, December 3, 2009

Today's Train of Thought- Centenarian!? She Doesn't Look a Day Over 93!

(Nevada Northern Railway)

2009 marks the 100th birthday of the Nevada Northern Railway's 2-8-0 #93. Built in 1909 at the American Locomotive Company's Pittsburgh works for the American Smelters Securities/Nevada Consolidated Copper Company, she served the copper mines and Nevada Northern Railway in and around Ely, NV until the mine's then-owner, Kennecott Copper, retired her in the early 1960s with the dieselization of the mining railway's fleet. The #93 was donated by Kennecott to the White Pine County Public Museum where volunteers eventually restored her to working order.

Kennecott closed down their mining operations around Ruth and Ely in 1978 and the smelter in 1983. The 140-mile line connecting the former Southern Pacific (now Union Pacific) at Cobre, NV to East Ely has been mostly disused since 1983- with Australia's Broken Hill Properties (BHP) operating the 120-mile portion of the Nevada Northern between the mines at Ruth and the former Western Pacific (now Union Pacific) interchange at Shafter from 1996 to 1999. In 2006, the city of Ely acquired the Ely-Cobre section of the line. There have been on-again/off-again plans for a coal-fired generating station to be built along the NN right-of-way around East Ely, but those plans were postponed as of Febuary 2009.

The lines directly servicing the former mining site between East Ely, McGill and Ruth were donated by Kennecott Copper to the White Pine Historical Railroad foundation. In it's present incarnation the Nevada Northern is, in effect, an open-air railway museum. In fact, in September 2006 the Nevada Northern yard, engine house, locomotives and rolling stock were recognized by the National Parks Service as a National Historic Landmark. Unsurprisingly, the NN also rosters three diesels- however, the newest of these was built in 1956.

Which brings us back to the Centenarian #93. Here, she's seen with a cut of hopper cars, throwing out plumes of smoke and steam against the deep blue skies of a high desert winter's day in Febuary 2007 on a photographer's special between East Ely and Ruth, NV.

Thursday, November 12, 2009

Today's Train of Thought- Old Army Veteran Soldiers On

Today's train of thought may look like a blast from the past, but it's actually from June of 2009. Here, railpictures.net contributor John Higginson catches Tennessee Valley Baldwin 2-8-0 #610 steaming past the Chattanooga National Military Cemetary on its return trip to the Tennessee Valley Railroad Museum right before sunset in Chattanooga, TN. The TVRM offers frequent steam and diesel excursions on trackage in southeastern Tennessee and the far northwestern corner of Georiga throughout much of the year. #610 is also a veteran of the United States Army- built by Baldwin-Lima Hamilton in 1952 for the US Army Transportation Corps. That is very new for a steam locomotive- in fact, the TVRM boasts that the #610 was the last steam locomotive that Baldwin-Lima Hamilton ever built for a domestic customer.