Showing posts with label New York Susquehanna and Western. Show all posts
Showing posts with label New York Susquehanna and Western. Show all posts

Tuesday, October 22, 2013

Today's Train of Thought- A Key Deposit, October 22, 2013

Today's Train of Thought takes us to the village of Deposit along New York's Southern Tier.

Located along the former Erie Southern Tier Line between Suffern, NJ and Buffalo, NY, the area around village of Deposit was settled in the 1880s [fairly recent for New York state- NANESB!]. The village itself straddles the Broome and Delaware County lines and reportedly got is name from nearby loggers and their practice of depositing logs along the river before floating them down the west branch of the Delaware River.

Both the highway and the railway that run through the village have undergone some noticeable changes in recent years. Completed in the 1850s, the Southern Tier line started out life as the Erie Railroad's primary link between New York City's western suburbs and the Buffalo area.

By 1960, the Erie had merged with Pennsylvania coal feeder line Delaware, Lackawana & Western to form the Erie Lackawana. However, like many northeastern rail carriers in the 1970s, the E-L would face hard times thanks to Hurricane Agnes, rising fuel costs and a labor dispute. By 1976 was actively seeking to be included in the formation of Conrail along with the Reading, Lehigh Valley, Penn Central and Central New Jersey. Part of the Conrail takeover included allowing trackage rights on the Southern Tier line to other railroads- the Delaware & Hudson's rights agreement with Erie-Lackawana between Buffalo and Binghamton were grandfathered in while the New York, Susquehanna and Western used trackage rights between Sparta Jct, NJ and Binghamton to reach their newly acquired line between Binghamton and Syracuse as well as the branch to Utica.

For Susquehanna, those rights remained intact throughout the Conrail era and during Conrail's 1999 breakup, the Norfolk Southern was awarded much of the former Erie lines. However, after Conrail's breakup, the Southern Tier line east of Binghamton saw decreasing traffic as the Norfolk Southern reached an agreement with Canadian Pacific and the Reading & Northern to route traffic east of Binghamton via Scranton and Allentown, PA.

Prior to the breakup of Conrail, the NYS&W regularly ran intermodal traffic over the Southern Tier line, exercising trackage rights between Buffalo and Sparta Jct, NJ- the line allowed the Chessie System and Norfolk & Western (eventually the CSX and Norfolk Southern) to access New York metropolitan area markets without interchanging with then-rival Conrail. However, that particular selling point of the Susquehanna was rendered moot when both CSX and Norfolk Southern were awarded lines in and out of northern New Jersey in the Conrail breakup.

Still, the Susquehanna had two disconnected lines that relied upon trackage rights over the Southern Tier line to connect them. By 2005, the New York, Susquehanna and Western had entered into an agreement with the Norfolk Southern to lease the 123 miles of line through rural New York and Pennsylvania between Binghamton and Port Jervis, NY to the Central New York- a paper railroad and wholly owned subsidiary of the NYS&W.

Two regularly scheduled freight trains still use the Binghamton-Port Jervis stretch of the line- Little Ferry, NJ to Binghamton freight SU-99 and its eastbound counterpart SU-100, although CSX will sometimes re-route trains via the NYSW if there is a derailment on the Water Level Route or Hudson River line.

Here, rrpicturearchives.net contributor David Abeles caught NYS&W SD40T-2 #3016 charging westbound through Deposit, NY on October 22nd, 2011 with a pair of leased SD40-2s trailing on freight SU-99 [and another yellow and black tunnel motor trailing, apparently dead in transit a few cars back- NANESB!]. The sun is out and the leaves have already turned on this fall day- according to the photographer, this was a pretty fortunate catch on his part since the SU-99 run is usually nocturnal- especially with the shorter days starting this time of year. The freight train is beginning its assault on the grade leading up to Gulf Summit to the east.

The highway around and through Deposit has also been undergoing some changes. Four lane New York Route 17 featured some at-grade intersections along the Southern Tier, but those are being eliminated and replaced for the highway's re-designation as Interstate 86, which eventually will run from Erie, PA to the New York State Thruway at Harriman, NY on the west shore of the Hudson River between Newburgh and the Tappan Zee Bridge.

Saturday, June 30, 2012

Long Overdue Iron Horse Update- Pan-Am, MM&A Look To Oil By Rail; Fatal Wreck in Oklahoma; Centennial Steam to the South Rim of Grand Canyon; Susquehanna Gets Oakway Rebuilds; Ambitous WV Tourist Train Project Proposed

Montreal, Maine & Atlantic SD40-2 #758 leads a motley assortment of EMD and GE diesels east through Frontenac, Quebec with unit crude oil train 606-245 on June 8, 2012. The train is bound for the New Brunswick Southern railroad interchange at Brownville Jct, ME. Frank Jolin photo via railpictures.net
NEW BRUNSWICK- Canada's largest oil refinery is looking to bring in shipments of oil from the Bakken shale and that could spell more traffic for some New England railroads depending on what route is selected.

A 104-car test train traversed the 2400 miles between the Dakotas and St John, NB using a BNSF-CSX-Pan Am- New Brunswick Southern route in late May and could provide Maine an economic boost.
The first big shipment was made over the weekend. Each of the 104 cars carried roughly 700 barrels of oil. The train traveled through Chicago to Rotterdam Junction, N.Y., where it moved over Pan Am Railways track through southern and eastern Maine and connected with the New Brunswick Southern Railway for the trip to Saint John.

Pan Am has been improving its tracks and adding locomotives and crews, making it a player in the growing crude-oil competition, according to Hall.

Pan Am operates one of three possible rail routes that can get crude to Saint John. Canadian National Railroad has another, which skirts Aroostook County and stays north of Maine. A third goes through Jackman, Greenville and Brownville Junction to reach New Brunswick via the Montreal, Maine and Atlantic Railway.

"Irving's going to go with whoever does the best job at the best price," Hall said.

The prospect of steady oil shipments has led Montreal, Maine and Atlantic to announce that it will double the frequency of its service from three to six days a week between Montreal and Brownville Junction said Ed Burkhardt, the company's board chairman.

Price is driving Irving's thirst for Bakken oil, Burkhardt said. Irving's refinery, which has a capacity of 250,000 barrels a day, primarily receives its supply via tankers from Venezuela, the Persian Gulf and the North Sea. But overseas oil now is roughly $20 a barrel more expensive, so it's cost-effective to move some of the supply thousands of miles by rail.

"Rail can land oil at Saint John at a better price than by sea," Burkhardt said.

The most immediate factor that could limit business is the availability of tank cars, which are in great demand nationally, Burkhardt and others say. It takes roughly six days to go from North Dakota to New Brunswick, plus offloading time.

If rail delivery grows, it could help Maine's struggling freight railroads and the shippers that depend on them, said Chop Hardenbergh, editor of Atlantic Northeast Rails & Ports. That could help improve service to Maine's paper mills and attract new shippers, he said.

"It certainly helps our railroads and our overall economy," Hardenbergh said.
Enviromental groups raised ocbjections over the 100+ car trains traversing enviromentally sensetive areas of Maine- these concerns were punctuated when a Pan-Am local freight derailed in Bucksport, ME in late May sending a pair of tank cars into the Penobscot River before rupturing and leaking a synthetic latex used in papermaking.

Montreal, Maine & Atlantic began running test trains to the St John's refinery shortly after striking Canadian Pacific employees were ordered back to work, thus enabling MM&A to interchange with railroads west of St Jean, Quebec.

Both the Pan-Am and MM&A hand off the unit oil trains to the New Brunswick Southern- either at Brownville Jct or Northern Maine Jct. Irving's St John's refinery is also reportedly eyeing an all-Canadian National route between the Saskatchewan portion of the Bakken and New Brunswick. The New Brunswick Southern and Irving oil refinery are both owned by J.D. Irving, LTD- a privately held company.

OKLAHOMA- Three crew members were killed in the Oklahoma panhandle last weekend when two Union Pacific freight trains collided with each other east of Goodwell, OK. Investigators from the Oklahoma Highway Patrol and NTSB said they had pulled the badly burned bodies of John Hall, Dan Hall (no relation) and Brian Stone from the wreckage. A fourth crew member identified as Juan Zurita jumped from the locomotive prior to impact and escaped with minor injuries.

NTSB investigators are combing the scene and interviewing Zurita to attempt to piece together what had happened. The signals along the line and brakes on the locomotives involved were in working order and no cell phones were found at the crash site. Some experts have speculated that human error- not neccesarily on the part of the crew- could've played a part in the collision.

The NTSB will also be investigating the event recorders- basically a locomotive's black box- before issuing a preliminary report in two weeks.

Grand Canyon 2-8-2 #4960 leads Santa Fe 4-8-4 #3751 on a steam doubleheader to the South Rim of the Grand Canyon outside of Williams, AZ on May 15, 2012.


ARIZONA- The San Bernardino Railroad Historical Society's restored Santa Fe 4-8-8 Northern #3751 powered an excursion from Los Angeles to the South Rim of Arizona's Grand Canyon National Park in May to mark the centennial of statehood for Arizona.

The train departed Los Angeles on May 14th and after making good time over Cajon Pass and to the massive former Santa Fe yard and depot in Barstow, CA proceeded east on the transcontinental mainline to the Arizona & California interchange at Cadiz, where it ran into some problems in the form of a 15 MPH slow order for the journey between Cadiz and the ARZC facilities in Parker. Continuing east to the junction with the BNSF 'Peavine' line at Wickenburg, AZ the following day, the #3751 and its Amtrak diesel helper trudged along under another slow order, eventually making its way onto the Peavine Line north of Wickenburg and stopping to take on water at the siding in Congress, AZ.

Santa Fe #3751 seen heading southbound across the Hell's Canyon Trestle on BNSF's Phoenix-Williams, AZ 'Peavine' line at Drake AZ on the return trip to Los Angeles on May 18, 2012
The special arrived in Williams, AZ well after dark on the second day, but the following morning it left Williams on time while paired up with Grand Canyon's waste vegetable oil-burning 2-8-2 Mikado #4960.

Although used sparingly by Grand Canyon Railway's parent company Xanterra, the former Chicago, Burlington & Quincy Mikado has already made a couple of trips this year including a Valentine's Day special where visitors could ride to the South Rim for 1912 prices to celebrate Arizona's Centennial.

After a day off, the #3751 began its return trip to Los Angeles with the Grand Canyon Limited on May 18, giving riders a rare mileage trip down the former Santa Fe freight line in daylight hours. Keeping close to its schedule, the #3751 took on water in Congress, AZ once again and made better time over the ARZC line between Wickenburg and Parker, AZ as the speed limit had been raised to 35 MPH for the return trip. The following day, the #3751 made much better time to the BNSF Transcon junction at Cadiz and had a relatively easy journey back to Los Angeles via Barstow and Cajon Pass.

Newly arrived Susquehanna SD60 #3810 seen leading westbound Little Ferry, NJ to Binghamton NY symbol freight SU-99 through Bogota, NJ on June 22nd, 2012. Brandon Kaback photo via rrpicturesarchives

NEW YORK, SUSQUEHANNA & WESTERN- The Susquehanna has recently taken delivery of six former Oakway SD60 that were extensively rebuilt by Paducah, KY-based VMV Paducahbuilt. In addition to major overhauls of the trucks, fans, wheels and prime movers, Eastern Railroad News is reporting that the units will be equipped with GPS tracking and a new AESS Fuel Management system. The units were built in the late 1980s for Oakway leasing and spent much of their service lives in freight service on the Burlington Northern and BNSF.

Although there were earlier reports circulating that one of the six EMDs would be adorned with a maroon and silver paint scheme reminiscent of the colors on Susquehanna's early ALCo diesels, it apprears as though all six will be delivered in the NYSW's contemporary 'Yellowjacket' scheme. Per Susquehanna tradition, the units will be assigned road numbers 3800 to 3810- even numbers only.

Previously, the Susquehanna had been utilizing older SD40T-2s and unrebuilt SD45s and a fleet of leased blue CEFX SD40M-2s to handle the heavier road freights between Little Ferry, NJ and Binghamton, NY. The NYSW is also reportedly evaluating four-axle gensets for local and yard service.

The Durbin & Greenbrier Valley's former Moore & Keppel 2-truck Climax is seen leading a mixed train at Durbin, WV in May 2010. The line is currently isolated from other railroads, but a plan is in place to reconnect both the Durbin & Greenbrier and Cass Scenic with the rest of the nation's rail network via the West Virginia Central. Kevin Madore photo via Railpictures.net
WEST VIRGINIA- Randolph County could soon become the lynchpin of an ambitious 90-mile tourist and heritage railroad circuit in the eastern part of the Mountaineer State. The county seat of Elkins is already home to the West Virginia Central's New Tygart Flyer and Cheat Mountain Salamander excursion trains. In 1997, the WVCR was selected by the state of West Virginia to operate 140 miles of former Western Maryland lines that CSX was looking to abandon. Besides a number of excursion services, the WVCR also hauls scrap metal and lumber for shippers in some of the isolated communities along the line. Prior to 1985, the south end of the line connected with the Cass Scenic Railroad south of Durbin, WV but the line was washed out in a flood 27 years ago.

The WVCR is also afilliated with the Durbin Rocket in nearby Pocohontas County. The Rocket is on an isolated 5-mile stretch of former Cheseapeke & Ohio line and offers short excursions and weekend stays in the wilderness in a caboose.

However, according to recent reports in the Elkins Inter-Mountain a proposal is being put before local Chambers of Commerce to restore WVCR's connections with both the Durbin Rocket and the Cass Scenic by rebuilding bridges and re-laying rail that would be ripped up from the dormant southwesternmost portion of the WVCR line between Laurel Bank and Bergoo, WV.
The project would add 60 miles of new rail trail, creating the Highland Adventure of Mountain & Rail, a 90-mile loop connecting Canaan Valley in Tucker County with The Greenbrier Resort, and Belington with Cass Scenic Railroad in Pocohantas County, Bergoo in Webster County and Snowshoe Resort.

"The goal is to have the trains load and unload in Belington," said Smith.

There could be economic benefits to all counties involved, combining recreation with transportation. Those with canoes, for instance, could go canoeing at one location, board a train, and canoe at another location in the same day.

"We think (the rail project) will open many new opportunities because of this plan," said Byrne.

The Highland Adventure of Mountain & Rail could result in the expansion of existing recreational opportunities in the area as well as provide an opportunity for others.

The project would cost about $20 million and is expected to attract 150,000 tourists in its first year, bringing a $50 million economic impact. In 2011, Smith's railroad had 35,998 passengers.

"With the new rail system, even West Virginia residents will have more places to go," said Byrne.

Many of the trains will travel through scenic areas of the state and provide the opportunity for many to merge their train rides with other recreational activities such as rafting, camping, hiking and more.
The plan coincides with the announcement of the West Virginia Railroad Museum selecting the nearby town of Beverly, WV for its new permanent home. The WVRM had originally planned to set up shop in Elkins, but was unable to meet planning requirements because the town's former Western Maryland depot wasn't big enough and the yard facilities couldn't accomodate the Museum's 90ft turntable. The Beverly site also features a historic former WM depot and is less than 10 miles away from Elkins.

Once moved into their permanent home, the West Virginia Railroad Museum plans on restoring some of their rolling stock to working order, including a pair of former West Virginia Northern 2-8-0 Consolidations, a 1943-built former US Army Baldwin diesel and a 1941-built Heisler geared steam locomotive- similar to the Durbin & Greenbrier's geared climax steam locomotive. This could provide an opportunity for the Museum's motive power to haul excursions on any of the three railways.

Coos Bay Rail Link leads a Eugene-bound train across a trestle at Hauser, OR on 2/23/12. The recently-reopened rail line has been mentioned as hosting unit coal trains bound for export from a facility to be built at the port of Coos Bay. Shane Gill photo via rrpicturearchives.net.
OREGON- In remarks at a 'green' energy conference at Portland, Oregon's Democrat governor has called for a 'sweeping review' by state and federal agencies of a number or proposed coal export terminals located throughout the Pacific northwest.
Kitzhaber, a Democrat with strong ties to environmental groups that oppose coal export, requested the comprehensive review in a letter Wednesday to the Bureau of Land Management and the Army Corps of Engineers today. He also called for the review in a broader speech on "clean energy" today before the Future Energy Conference in Portland.

“We’re rushing to this huge infrastructure investment without a full national discussion,” Kitzhaber said after the speech. “I think we deserve to have a full debate on this.”

Kitzhaber didn't take a stand for or against exporting coal, which supporters say would increase rural jobs and tax revenues.
The proposed coal terminals and upgrading the rail lines that would serve them would create much-needed jobs for rural Oregon- the statewide unemployment rate currently is 8.4%. Kitzhaber likely ordered the review to make certain the coal terminal proposals would die a slow death via red tape and regulations rather go on the record as nixing the projects outright. Rural Oregon's economy has been struggling decades before the 2008 subprime lending meltdown triggered a global recession- with their timber industry coming under increasingly strict regulations due to pressure from environmentalists.

The coal would come from the Powder River basin and be shipped via Union Pacific or BNSF to one of the proposed terminals. With half the sites under consideration, the coal trains would have to be handed off to another railway to reach the port. Among the possible terminal locations are Bellingham, Longview and Grays Harbor in Washington state and Coos Bay, Port Westward and Morrow in Oregon. Located much further inland along the Columbia river, Morrow is a realtively short distance away from Union Pacific's yard in Hinkle, OR while any trains using Coos Bay would utilize the newly re-opened rail line between Coos Bay and Eugene. Just west of Portland, Port Westward would utilize Genesee & Wyoming's Wilamette & Pacific railroad while the Grays Harbor proposal would utilize Rail America's Puget Sound & Pacific.

The proposals have met with fierce opposition from environmentalists who are now claiming that coal trains can cause cancer or something. I shit you not- the very same environmentalists who hadn't said a word about train loads of trash being taken from metropolitan areas in the Pacific northwest and being dumped in eastern Oregon and Washington for the last 25 years are now warning the public on the health risks of dust blowing off from passing coal trains.

Meanwhile, Coos Bay Rail Link has obtained two GP38 locomotives to handle an expected increase in traffic as track rehabilitation slated for this summer will lead to increased train speeds between Coquille, OR and Eugene. A number of local companies were awarded contracts for weed abatement, bridge repair and tie replacement along the 134-mile route.

Tuesday, September 6, 2011

Tropical Storm Irene Aftermath Iron Horse Roundup September 6, 2011

Pan Am ballast train in Greenfield, MA en route to washout at Charlemont, MA on Aug 30th- photo Billy Wehmeyer
Hurricane Irene struck the Berkshires on Aug 28th and there was sizable washouts on Pan Am's former Boston & Maine Fitchburg Division between Ayer, MA and Mechanichsville, NY along the Deerfield River between North Adams and Shelburne, MA. With slow orders in effect for a number of locations, crews were able to get the line reopened by the evening of August 31.

Canadian Pacific's former Delaware & Hudson mainline between Albany NY and Binghamton NY suffered a number of washouts, forcing some trains to be rerouted via CSX's (suddenly ironically named) Water Level route west of Schenectady, NY all the way to Syracuse where they were redirected to Binghampton on the New York Susquehana & Western's Northern Division.

The Canadian Pacific line between Saratoga Springs and the Canadian border at Rouses Point, NY (and on to Montreal from there) suffered minimal flooding and obstruction and for the most part remained open. Besides through freight from CP Rail, the line also hosts Amtrak's Adirondack New York City to Montreal service.

After work was completed on a damaged section of track in Central Bridge, NY, Canadian Pacific resumed operations on the D&H Bridge Line between Albany and Binghaton NY on September 1.

CSX's Selkirk NY to Buffalo Water Level route was flooded, but reopened after a few days while the line along the West shore of the Hudson River experienced a number of floods, washouts and landslides. Crews reportedly had managed to get the line reopened by the early morning hours of August 30th. A CSX service bulletin dated September 3 reports that MOW and signalmen have been working to restore tracks, crossing signals and roadbed throughout affected areas in Pennsylvania, New York, Massachusetts, New Jersey and Maryland.

The New England Central's former Central Vermont Railway line still remains closed between White River Jct and Essex Jct, VT. Curiously, Amtrak's Vermonter service wasn't affected because passengers for north of Springfield, MA would be served by bus due to ongoing track upgrades along the New England Central since June. The NECR between Essex Jct and the Canadian National interchange in Swanton, VT to the north remains open as well as the line to the south between White River Jct and New London, CT.

Although no timetable for reopening the line between White River Jct and Essex Jct has been announced, a service bulletin dated September 2nd announced a detour train was scheduled to deliver cars to the Canadian National on September 9th.


Washout on the Vermont Railway line in Sunderland between Rutland and North Bennington, VT. Photo- Tim Stockwell
Undoubtedly the hardest hit railroad was the Vermont Railway system, with all of their lines radiating out of Rutland, VT flooded or washed out at some point along the way. The former Delaware & Hudson line between the Canadian Pacific interchange at Whitehall NY and Rutland was the first to re-open, with Amtrak's Ethan Allen resuming service on September 1. The line north between Rutland and Burlington was reopened on Aug 31, with a fuel train to Burlington, VT being the first train through.

However, things were different to the east and south of Rutland. The line south to Bennington, VT and on to the Pan-Am interchange in Hoosick Falls, NY was hit by several washouts. The Green Mountain line between Rutland and Bellows Falls, VT was much worse off and will likely take several weeks to repair.
Vermont's state-owned rail lines have been heavily damaged by Tropical Storm Irene.

An inspection found that five of the state's railroad bridges have major structural damage and need major repairs before they can re-open to freight traffic.

The middle piers of one bridge on the Connecticut River line in Hartford was moved more than 6 feet by rushing floodwaters. Yesterday, a crane was sent to stabilize that bridge, and allow work crews to install temporary shoring.

The Green Mountain line and the Vermont Rail South line rail beds have also seen a number of washouts, culvert failures and erosion of the rail bed.

Freight traffic is still running between Burlington and Rutland, and the Ethan Allen Amtrak line resumed service on Saturday.

Vermont Rail Systems estimates it will be three to four weeks before freight begins moving again on the Green Mountain rail line.
It appears that the Vermont Railway has put a priority on getting the Green Mountain route open so that Canadian Pacific bridge traffic to the New England Central and Providence & Worcester can resume as well as providing a viable detour route while the New England Central line north of White River Jct. is being repaired.

Crews from Vermont Railway and contractor RJ Corman were reportedly dumping ballast and rip-rap along washed away sections of track between Rockingham, VT and Wallingford, VT using hi-rail equipped dump trucks. Structural engineers are also attempting to shore up bridges that were compromised by the flash floods.

The Washington County (a subsidiary of the Vermont Railway) line between Newport, VT and White River Jct is intact, but WACR/VTR power is 'marooned' in from the rest of the system in Bellows Falls or White River Jct. For the time being, the WACR is borrowing a B39-8 from the Montreal, Maine and Atlantic to serve customers on the line. Until the New England Central line reopens and engineers shore up the damaged bridges around White River Juntion, the only interchange is with the MM&A at Newport, VT where the line heads northwest to Farnham, Quebec.
Green Mountain Railway Alco RS-1 shoving on rear of empty ethanol tank train past Bartonsville covered bridge, April 2011.
While not part of the Vermont Railway System, the photogenic Bartonsville covered bridge (above) adjacent to Vermont Route 103 and the Green Mountain Railway was popular with railway enthusiasts and tourists. Perhaps the most iconic image of the damage Irene had wrought on the Green Mountain state, the covered bridge was captured on video being washed away by the raging torrent of the Williams River by a local resident.

Location of Bartonsville covered bridge after Irene- Both photos from Kevin Burkholder
While the bridge was insured by the village of Bartonsville for $1 million, the polity only covered the wooden structure but not the abutments which will need further repair. A fund for replacing the bridge has been set up on the Rockingham-Bellows Falls town website.

The New York, Susquehanna & Western experienced some flood damage to their right-of-way in northern New Jersey between their Little Ferry, NJ hub and Port Jervis, NY. However, there was no damage reported to the Southern Tier line between Binghampton NY and Port Jervis and their Northern Division between Binghamton and Syracuse, NY also managed to survive intact. The Susquehanna was able to resume operations on their Sparta Jct NJ-Little Ferry, NJ line by September 1.

In the Catskills, the Catskill Mountain Railway is expected to resume operations out of Mount Tremper, operating excusrions on a modified route beginning September 10. Meanwhile, just to the north, a notice on the Delaware & Ulster website announced that the railway was shut down until further notice due to flash flooding from Irene.

Over in rural Washington County NY, the 33-mile Batten Kill railroad suffered some flooding from its namesake river and fallen trees along the right of way, but suffered no washouts or damage to its bridges. While the line remained open after Tropical storm Irene passed, interchange with the Pan Am Railway at Eagle Bridge, NY was limited due to flood damage from the swollen Deerfield River that railway suffered on the line between North Adams, MA and Shelburne, MA.

Despite the damage inflicted to railroads to the immediate north and west, Canaan, CT-based Housatonic Railroad experienced minimal disruptions on their line through Westernmost Massachusetts and Connecticut from Tropical storm Irene.

Sunday, July 4, 2010

Some Star Spangeld Trains of Through- July 4th, 2010.


Since today is no ordinary day, I thought Today's Trains of thought could deal with themes like Determination and Redemption....and of course....fireworks.

Southern Pacific's 1941-built Lima GS 4-8-4 'Mountain' was withdrawn from 'Daylight' service in 1957 and put on display in a Portland, OR park upon retirement. There, she was vandalized and stripped for parts by opportunistic scavengers until she was 'scouted' in 1974 for something called the American Freedom Train. This was actually the second train to go by that name- Harry Truman's At tourney General, Tom C. Clark, proposed the train as a means of reawakening the American public to the nation's history and liberties in the Post WWII-era. The 1947-1949 Freedom train carried original copies of the US Constitution, Bill of Rights and Declaration of Independence, accompanied by US Marines at all times. The idea for a second 'Freedom Train' came about in the mid 1970s in time for America's bicentennial, although it carried different items like an original copy of the Louisiana Purchase and Martin Luther King's pulpit and robes as well as a moon rock brought back by NASA.

Despite the vandalism and scavenging, the bearings and rods for #4449 were determined to be in good shape, making her a prime candidate for the Bicentennial Freedom Train. After a mow months of restoration work, the 4449 along with former Reading Baldwin 4-8-4 Consolidation T1 #2102 (which was operating as recently as 2005 in Washington State) and former Texas & Pacific Lima 2-10-4 Texas class #610, the Bicentennial Freedom train would tour the 48 contiguous states. The #4449 would go back to being repainted in er former orange and yellow 'daylight' colors and work numerous excursions over then next 25 years- mostly around Portland, OR- and is currently operated by the Friends of the 4449 and the Oregon Rail Heritage Foundation.

In the wake of the September 11 attacks, somebody at the roundhouse in Portland got it in their minds to 'restore' 4449 to her bicentennial American Freedom Train as a point of pride. In the spring of 2002, she emerged from Portland, OR's Brooklyn Roundhouse in the AFT Red White & Blue and operated a series of long-haul excursions over BNSF's Oregon Trunk line. Above, photographer Bruce Fingerhood catches the meticulously repainted Lima charging over Trout Creek Trestle on the BNSF Oregon Trunk Line en route to Bend, OR in March 2002. The 4449 returned to her original color scheme the following year.




But what would the 4th of July be without some fireworks? Here, New York, Susquehanna & Western SD40T-2 #3014 and two other 'yellowjacket' tunnel motors are done for the day and awaiting a new crew before taking train SU-100 further east on this summer 2008 Binghampton, NY evening but the fireworks at the Binghampton Mets' NYSEG stadium are just getting under way. Railpictures.net contributor Christopher Blaszczyk was the intrepid photographer who found the yellow and black tunnel motors in repose at Binghampton's BD Cabin.

Like the #4449, NYSW #3014 had spent much of its working life on the Southern Pacific before being struck from the roster and moving elsewhere.

Monday, October 26, 2009

Iron Horse Roundup: Week of October 20-26

(railpictures.net/Brandon Kilgore)
Canadian National announced that it was purchasing 35 new 4400 HP ES44AC 'GEVO' locmotives from General Electric and 35 new 4350 HP SD70M-2 locomotives from EMD. The GEVOs are expected to arrive in late 2010 while the SD70M-2s are expected to be on the property by January 2011. Here, CNR ES44AC #2305 is seen with another GEVO on the former Elgin, Joliet & Eastern trackage in West Chicago, IL in September 2009.


(Dean Sauvola/Railpictures.net)

Tourist hauler Wisconsin Great Northern got a substantial increase in horsepower last month with the acquisition of former Wisconsin Central SD40-2 #6006 and Duluth Missabe & Iron Range SD38AC #200 from Canadian National. The railway already owns a 1940-built SW1 and a 1949-built EMD F7A primarily used for their excursions. However, with the recent downturn in traffic on many Class 1 railways, Wisconsin Great Northern agreed to store idle tank cars along its line and in it's Spooner, WI yard. Here, WGN employees are inspecting #6006 shortly after arrival in Spring Brook, WI. It's believed the #6006 and #200 will handle the stored freight cars while the 1940s-vintage diesels will continue with the tourist trains.




The New York, Susquehanna & Western has reportedly put their fleet of GP18s, GP20s and sole operating F45 up for sale. NYS&W F45 #3636 was thought to be one of the last F45s operating in revenue service in the country. Here, the #3636 is seen snaking though downtown Port Jervis, NY with Little Ferry NJ-Binghampton, NY freight SU-99 in June 2006. This would leave NYS&W with their former Denver, Rio Grande & Western and Southern Pacific SD40T-2 'Tunnel Motors' as the backbone of their locomotive fleet.




An Australian baby cheated death when his carriage rolled off a platform and in front of a Connex commuter train in Melbourne earlier this month. The incident was caught was caught on the Ashburton station's CCTV system. 6-month old Saurish Verma survived with some cuts to his face after being dragged roughly 30 meters before the train came to a stop.



*Workers for the largest union representing tranist workers from Philadelphia's SEPTA have voted unanimously to strike if no contract is reached with management this week. A walkout by SEPTA workers could take place when the Phillies are slated to host the Yankees for games 3, 4 and 5 (if neccecary) of the World Series. The strike would include the Broad Street subway line, which links Citcizen's Bank park and Lincoln Financial Field with downtown Philly. SEPTA's suburban commuter rail service wouldn't be affected, as those workers are represented by a different union.


*Authorities in Egypt have filed charges against three railway workers in a deadly 2-train collision that killed at least 18 people over the weekend. The two trains collided at Girzah south of Cairo after the first train hit some livestock that wandered onto the tracks before coming to a stop and the second train plowed into the rear of the stopped train at full speed. One of the rail workers is charged with abandoning his post.